- 2 Plots: 14,45 Ha. with independent entrance gateways
- Construction Area: 248 m2 agricultural building
- Divisions: 5
- Licensed Construction Area: 314 m2
- Licensed Divisions: 7
- Sand riding training school
- Internationally sized grass jumping arena
The property consists of:
- 2 large plots with licensed ruins along side the lake with independent entrance gateways
- Productive Olive Plantation with around 400 trees
- Paddocks including 11 loose boxes in concrete ring beam construction and American Barn configuration with approximately 900m2
- Sand training school
- Internationally sized grass jumping arena
- Grip Room
- Internal land fenced to interlinking paddocks with field shelters and piped water
- Workshop
- Fully fenced on perimeter.
The connection of the Alqueva Dam to the Monte da Rocha reservoir, a project scheduled for completion by the end of 2025, will reinforce the water resources of the Monte da Rocha reservoir. Allowing the lake level to be maintained permanently at 70% and continuing to ensure public water supply to the region.
Ourique region have had a great development is the last years providing a surgery center and Castro Verde has a 24 hours medical attendance unit just 15 kms way.
